Selected projects
Work by the lead engineer, described with the figures from the issued calculations. Client and project names are withheld.
-
Piled foundation for a 44 m tower crane
Four-pile cap designed from the crane supplier's reactions, with in-service and out-of-service cases applied at 0, 45 and 90 degrees.
Case study -
Six light pole types, from shaft to footing
One report covering six tapered steel poles from 6 m to 16 m: wind loads, analysis, base plates, anchor bolts, pedestals and footings.
Case study -
Rooftop equipment check on existing buildings
Revised MEP equipment on two existing roofs, followed from slab to columns to footings to soil, with ETABS and SAFE.
Case study -
Villa with basement, piles and swimming pool
Basement, ground and two upper floors on piles, with a separate pool model, taken through two rounds of authority review comments.
Case study
These projects were carried out by the lead engineer in employed roles with UAE consultants and contractors, before or alongside StruVanta Design. They are shown to illustrate the method and standard of work; the design responsibility on each project rested with the organisation that issued it.
Have a project that needs extra hands?
Send the drawings and brief. You will receive a scope and fixed fee within 24 hours.