Rooftop equipment check on existing buildings

Revised MEP equipment on two existing roofs, followed from slab to columns to footings to soil, with ETABS and SAFE.

ABCD123 AHU CU TANK PV ARRAY HP PUMPS NEW EQUIPMENT ON EXISTING ROOF SLAB (INDICATIVE)
Schematic, not to scale.
Type
Design verification
Location and year
Abu Dhabi, UAE, 2025
Software
ETABS, SAFE
Role
Verification reports, prepared as structural engineer with a UAE contractor

The project

On two existing reinforced concrete buildings, the MEP and electrical equipment layout on the roof was revised after the structure was designed, adding load the roof was not originally checked for.

What made it difficult

This is verification, not design. Member sizes and reinforcement are already fixed, so the question is whether they still work, and where they do not, exactly where extra capacity is needed.

How it was designed

  1. Converted each equipment item from the MEP load data into an area load at its actual position on the roof.
  2. Kept the equipment as a separate load pattern beside superimposed dead and roof live load, so it stays visible in every combination.
  3. Checked columns and frames in ETABS and extracted dead and live reactions at the base.
  4. Checked the roof slab reinforcement and long-term deflection in SAFE, and the footings for bearing pressure and reinforcement.

Key figures

As stated in the issued calculations.

StructuresTwo existing RC buildings
Elements checkedRoof slab, beams, columns, isolated footings
LoadsEquipment, superimposed dead, roof live and MEP live load
Slab checksReinforcement and long-term deflection
Footing checksBearing pressure and reinforcement
OutcomeAll frame members passed the ETABS design check